The project is based on the GET H2 Nucleus project which includes the installation of 100 MW electrolysis capacity at the RWE site in Lingen and the construction of a pipeline infrastructure (Nowega, OGE) for pure hydrogen to customers in Lingen, Gelsenkirchen (both BP), and Marl (Evonik). The partners plan to connect cavern storage facilities (RWE) and grid links to the Netherlands (Thyssengas), the wider Ruhr region, and Salzgitter. The objective is to also integrate the SALCOS project into the infrastructure which aims to build a 100 MW electrolysis plant in Salzgitter as part of GET H2. In parallel, the electrolysis capacity at RWE's site in Lingen will be expanded to 300 MW, making green hydrogen available to buyers in large quantities.